4/7 Series Centerline StrikeInstallation Instructions
|
4 Series Centerline Strike
Accommodates 3/4” (19mm) latch projection
Insert Depth: 1-1/2”D (38mm)
Fire-rated only available in fail-secure mode with 04 & 14 faceplates
CAN/ULC S104, 1-1/2-hour fire-rating listed
7 Series Centerline Strike
Accommodates 5/8" (16mm) latch projection
Insert Depth: 1-1/2"D (38mm)
| Document ID | Description | Format |
Release Date |
| IS47_R0324 | 4/7 Series Centerline Strike Installation Instructions | 3/24 |
|
|
|
||
| IS47JIG_R0524 | 4/7 Series Centerline Strike Frame Prep JIG | 5/24 |
|
| 1524755675-isle-r0721 | 4/7 Series Centerline Strike Lip Bracket Extension Installation Instructions | 7/21 |
|
| ISICEPK_R0824 | Ice Pack Installation Instructions | 8/24 |